11 Dec: 5 apartments left for sale and ready to be occupied!  Please see the latest interior photos below: 

3 Nov: very nearly finished.  One week to go!  Would you like to stay in your very own ski-in / ski-out apartment these holidays?

10 Oct: the kitchens have arrived and we are now starting installation.  Meanwhile the snow has arrived.  Please contact us today if you want to stay in your brand new ski apartment this Christmas holiday. We have 5 apartments left.

23 Sept: Good progress being made: the bathrooms are being tiled, the roof covered and plastering has commenced on the interior walls.

9 Sept: insulation going in and work on facades has started.

2 September 2016: we have topped out in Kühtai.  Now for a small celebration with the team: Firstfeier. 

roof-2roof3

27 August 2016: we are about to “top out” with work commencing on the roof.  Windows are in too.

topout

16 August 2016: building shell of the 2020 Residences Kühtai is nearing completion with work underway on the Penthouse apartment.  After that, we will start the roof.

kuhtai 17 august

Meanwhile, the electrics, central heating and plumbing are in place.

8 August 2016: as the shell progresses we are now in a position to start adding the windows at the 2020 Residences Kühtai.

Screen Shot 2016-08-12 at 17.12.33

Inside the building, the screed is being laid on the lower floors.

24 July 2016: The construction of the building shell continues according to plan and we are expected handover dates for the end of November.  On time and budget.

kuhtai 25 july 3

We have already begun with the installation of the heating and sanitary systems.

kuhtai 25 july

The ceiling is in place on the second floor and work is progressing nicely on the third floor.

kuhtai 25 july 2

4 July 2016: second floor now in place.

2nd floor

27 June 2016: here are the walls for the first floor.

27 June

17 June 2016: first floor on its way to completion.  More updates in the next few days as we start the walls for the first floor.

kuhtai 15 june 2

In the shot below, you can start to appreciate the scale of the building and the entire first floor plan which will have covered parking spaces.

kuhtai 15 june

7 June 2016: Progress continues at 2,020 metres as the snow slowly melts away. The ground floor walls are being put in place and next comes the ground floor ceiling in the Kühtai 2020 Residences.

kuehtai baustelle 6 June

There are 5 apartments left if you want to own one of the best ski-in, ski-out apartments in Austria’s highest ski resort.

kuehtai baustelle 6 June 2

25 May 2016: update from the building site in a sunny and snowy Kühtai.  As you can see the ground floor walls are now being formed and concreted and the North East side of the building cleared.  Lots of snow around which can be a challenge when building at such high altitudes.

kuhtai 25 May 1

More updates to follow on this page as we get the Kühtai 2020 Residences ready for handover in Autumn.

kuhtai 25 May

29 February 2016: There’s a lot of work happening behind the scenes in Kühtai in these snowy times.   The engineers are developing the detailed drawings plans (Ausführung Plane) and we are close to concluding our tendering work for local firms to carry out all the heating, plumbing, electrics and joinery work.

We have also just received some proposed kitchen designs for the Miele Centre in Innsbruck – all apartments have Miele cookers, dishwashers and appliances.

kitchens

14 December: if you are visiting Kühtai these holidays then please do arrange to meet with one of our bi-lingual representatives in the resort right next to the Dorfstadl: Google Map location https://goo.gl/maps/9VGMrWbjtm42

kuhtai sign

We would be delighted to discuss the new 2020 Residences Kühtai with you in person.

24 November: interesting 3D model back from the structural engineers to the project team for the 2020 Residences in Kühtai.

2020 Residences Kühtai 3D

Don’t usually get to see how the basement floor looks in this kind of development.

12 November: Nice progress being made at the 2020 Residences in Kühtai.  The excavation is complete and the underground floor and walls are being assembled.

More updates to follow.

Property in Kühtai, Austria - Kristall Spaces

8 October: Kristall Spaces is delighted to announce that this week we have broken ground in Kühtai.

Kühtai-2020-Residences-by-Kristall-Spaces-excavation-October

Excavation is underway to create the foundations of the 2020 Residences in Kühtai.

Please keep checking this page or indeed our other channels (Facebook, Google+ and Twitter) for regular updates as we progress with these luxury apartments in Austria’s highest ski village.

Constructions starts in Kühtai 2020 Residences